43.1594° N · 79.2469° W — Serving the Niagara Peninsula since 2004
04 — Replacement · New construction · Upgrades
Furnace Installation
A new furnace, sized by calculation — not by the old label.
Most furnaces we replace are oversized by 40% or more. Right-sizing means quieter operation, fewer cold spots, and lower bills from the first night.

- 7 hrs
- Average swap time
- 12 yr
- Parts warranty
- 0
- Surprise charges
Scope
What’s included.
04.1
Right-sized equipment
CSA F280 heat-loss calculation for every room before we recommend a BTU rating.
04.2
Venting & gas done properly
PVC venting, gas line sizing and condensate management to code.
04.3
Duct corrections
Return-air additions and transition fixes that unlock the new furnace's efficiency.
04.4
Clean-site install
Floor protection, dust containment and full removal of old equipment.
Process
STEP 01
In-home assessment (45 min)
STEP 02
Three-option written proposal
STEP 03
Installation day & TSSA documentation
STEP 04
Commissioning + first-year check-in
Questions
Asked often.
How much does a new furnace cost?
Most Niagara replacements range $5,800–$9,400 installed, depending on efficiency, venting and ductwork.
Can you install the same day?
In no-heat emergencies we keep common sizes in stock and can often install within 24 hours.